Advanced Aviation Sciences, LLC
Advanced Aviation Sciences, LLC
Bridging Technologies Between The USA And Europe
Bridging Technologies Between The USA And Europe
Hub & High Volume Airport Report Card
- Analyze Schedule Delay for hub airports
- Arrival and departure Schedule Delay as a result of:
- time of day
- airport configuration
- Visual conditions (demand vs. capacity)
- IFR conditions (demand vs. capacity)
- Composite Airline schedules (all airport schedules combined)
- Individual airline schedules
- Analyze Air Traffic Control operations
- Runway capacity vs. actual performance
- ATC initiatives required
- CDR usage
- Analyze Airport operations
- Performance Benchmarking
- Gate hold outs
- Pad operations
- Gate utilization
- Ramp tower performance
- De-icing operations